WORKS: Consolidation and restoration works of the Tramontano Matera Castle
WORKS: Consolidation of the built-up area of Pescopagano (Pz) of the NE and SE sides of the inhabited center
WORKS: Primary urbanization works in the development plan of Via Gravina "Giada". Execution of piling, foundations, walls and boundaries
AMOUNT : € 837.385,00
WORKS: Enlargement and arrangement of Via Gorizia, between the Provincial Road 80 Bari - Valenzano and the PEEP district of Ceglie.
WORKS: Environmental characterization works former Municipal landfill located in the locality of Piscina di Susa.
WORKS: Characterization of the former Tufarelle landfill. Execution of Surveys, soil extraction, subsoil, water and related analysis.
WORKS: Execution of geotechnical surveys to be carried out on the site of the Area Trisaia and Laboratory deactivation.
WORKS: Characterization of the sedimentation area of the wastewater treatment plant compartment B - Ferrandina (Mt)
WORKS: Environmental characterization of consortium areas
WORKS: Urgent remediation, environmentalization and redevelopment of Taranto.
WORKS: Creation of piezometers for monitoring and extraction of groundwater at the ENEA site of the CR Trisaia.
YEAR EXECUTION: 2018
WORKS: Execution of geognostic investigations and relative laboratory tests.
WORKS: Geognostic surveys for the preparation of the preliminary project of the Single Hospital for acute cases of Lagonegrese.
WORKS: Surveys concerning the study of the water potential of the Sarmento Valley.
WORKS: Support services to the ANAS design team for the preliminary design and for the environmental impact study of the A3 - A16 link of the Lauria-Candela itinerary.
WORKS: Construction works Cavonica - Fossa Acqua Bianca section - SS 407 Basentana - Geognostic surveys.
WORKS: Geognostic surveys for the preparation of the preliminary project of the Single Hospital for Acuti del Lagonegrese
WORKS: Geological-geognostic surveys Abriola - Potenza link road
WORKS: Execution of geognostic investigations on-site and laboratory tests for the study of instability along the SP 125 “Ponte Celone-Ponte Lucifero” between the progg.ve Km18 500 - 19 000
WORKS: Execution of geognostic investigations on-site and laboratory tests for the construction of a bridge over the S. Tecchia canal along the SP. 60
WORKS: Execution of geognostic investigations on-site and laboratory tests for the construction of the Candelaro Bridge along the SP. 74
WORKS: Execution of geognostic investigations on-site and laboratory tests for the modernization and adaptation of the SP.28 “Pedegarganica”.
WORKS: Surveys, sampling and geophysical tests on 16 sites of the regional territory, for carrying out seismic microzonation studies.
WORKS: Execution of geotechnical investigations to be carried out on the Trisaia Deactivation Area site and in the Laboratory.
WORKS: SS 7 Ter Work on modernization of the Trunk section Mandria - Lecce 1st lot - 2nd section - Functional completion of S. Pancrazio.
WORKS: Hydrogeological risk mitigation intervention and reclamation of the cavities present in the locality "Chiancone - Fornaci"
WORKS: SS 95 di Brienza. Works for geognostic investigations aimed at the geological and geotechnical modeling preparatory to the adaptation of the Satriano junction.
WORKS: SS 658 "New route Potenza - Melfi". Integrative geognostic investigations aimed at designing the artery safety measures.
WORKS: SS 92 "of the Southern Apennines" km. 33 700 - Emergency works for carrying out geognostic investigations aimed at geological and geotechnical modeling following the current landslide intervention.
WORKS: Geognostic surveys carried out at the Genzano di Lucania shipyard - Diga.
WORKS: Geognostic surveys for the "Executive project for the expansion and extension of the sewerage network of the Municipality of Brindisi (BR)" - COD P 1027.
Works: Geognostic surveys related to the geological study in support of the hydrogeological risk reduction works. Cod. PZ051A / 10 - Municipality of Picerno.
WORKS: Survey Plan aimed at defining the environmental status of the soil, subsoil and groundwater of the area covered by the ESF station, located in Via Oberdan in Bari.
WORKS: DGR n ° 1117 of 08.31.2015 - Rescheduling of FAS 2000-2006 and FSC 2007-2013 resources "Strengthening and rationalization of the purification system for the built-up area of Lauria" Amount € 1.700.000 - Placing geological surveys on the sites affected by the 'intervention.
WORKS: Supply of drilling services and installation of instruments in situ near the Pisciolo stop in the countryside of Melfi (PZ).
WORKS: Supply of drilling services and installation of instruments in situ near the Pisciolo Stop in the countryside of Melfi (Pz).
WORKS: DGR n ° 1117 of 08.31.2015 - Rescheduling of FAS 2000-2006 and FSC 2007-2013 resources "Strengthening and rationalization of the purification system for the built-up area of Lauria" Amount € 1.700.000. Entrusting geological surveys on the sites affected by the intervention.
WORKS: PO FESR Basilicata 2014-2020- Internal area Materana Mountain. Renovation works for the structural and functional improvement of the Oliveto Lucano - Monte Croccia municipal road
YEAR EXECUTION: 2018
YEAR EXECUTION: 2019
YEAR EXECUTION: 2019
YEAR EXECUTION: 2019
YEAR EXECUTION: 2019
YEAR EXECUTION: 2019